construction work

Track works

Welding and grinding refurbishment of a turnout in Zehlendorf + Inspection of the track vacancy detection equipment on the Schlachtensee-Botanischer Garten track + sleeper replacement on the Zehlendorf-Lichterfelde West track

from
Monday, 14.04.2025
22:00
until
Tuesday, 15.04.2025
01:30

Affected train traffic

show details

This construction measure is taken into account in the Journey Planner

Back to details
at night

Zehlendorf <> Botanischer Garten

Night 14./15.04. (Mon/Tue) 10 p.m. to 1.30 a.m.
Time changed
Information
Back to details
at night

Wannsee <> Zehlendorf

Night 14./15.04. (Mon/Tue) 10 p.m. to 1.30 a.m.
Train service changed
Information
Details
  • Train service amended:
    • Passengers travelling on the S1 please change at Zehlendorf in both directions; the onward journey in the direction of Oranienburg takes 16 minutes and in the direction of Wannsee 11 minutes from the same platform
  • Timetable change:
    • The S1 runs 4 to 5 minutes later from Wannsee to Zehlendorf. In the opposite direction, the S1 runs 11 minutes later from Zehlendorf to Wannsee, in Wannsee the transfer time to the S7 to Potsdam Hbf is 9 minutes.