construction work

Track and switch works

- Welding and grinding refurbishment of two points in Beusselstrasse + rail milling in Wedding and Beusselstrasse

from
Tuesday, 24.06.2025
22:00
until
Wednesday, 25.06.2025
01:30

Affected train traffic

show details

This construction measure is taken into account in the Journey Planner

Back to details
at night

Westend <> Gesundbrunnen

Night 24./25.06. (Tue/Wed) 10 pm to 1.30 am
Time changed
Information
Details
  • Train service amended:
    • Passengers travelling on the S41 and S42 should change trains in both directions at Westhafen and continue their journey after 7 minutes (S41) or after 7 or 17 minutes (S42) from the same platform or from the opposite platform.
  • Interval change:
    • Westend <> Westhafen S-Bahn service only at 20-minutes interval
  • Timetable change:
    • The S41 runs from Westhafen to Gesundbrunnen 3 minutes earlier.
    • The S41 trains terminating in Westend will run 3 to 4 minutes later from Westkreuz to Westend. The S42 runs 2 minutes earlier from Westhafen to Westend.